Aggregated home batteries dispatched as one resource. The trade is control over your own stored energy at exactly the moments it is most valuable.

  • Difficultyintermediate

A single home battery is too small to matter to the grid. Ten thousand of them, dispatched together, are the size of a generating plant, and that is the idea a virtual power plant is built on.

For the homeowner it is a straightforward trade with one term that deserves careful reading: the battery is dispatched when the grid needs it, which is generally when you would want it too.

What It Does

An operator coordinates a fleet of distributed batteries and dispatches them as one resource, bidding that capacity into markets or contracting it to a utility.

During a dispatch event the batteries discharge to the grid, or reduce household draw, according to the operator’s instruction. Between events they operate normally.

The economics for the operator come from the value of capacity available at short notice. A portion of that is shared with participants, which is what makes enrolment worth considering.

The Trade

Battery on its ownEnrolled in a programme
Who decides discharge timingYou, or your settingsThe operator, during events
Availability during an eventFullReduced to whatever reserve is held
Backup after an eventFull chargeDepends on state of charge left
CompensationBill savings onlyBill savings plus programme payments
Cycles usedYour usageMore, which affects warranty terms

The second and third rows are the substance of it.

Dispatch events occur when the grid is under stress: a hot afternoon, a cold snap, a supply shortfall. Those are the same conditions that make an outage more likely.

A battery that discharged into the grid at five o’clock has less available if the power fails at seven. That is not a flaw in the concept; it is what participation means, and it is why the reserve setting matters more than any other term.

The Reserve

Most programmes allow a proportion of capacity to be reserved and never dispatched.

Set high, the reserve protects backup capability and reduces what you are paid. Set low, participation is fuller and the battery may be near empty after an event.

Deciding this properly means knowing what the battery is for. If backup during outages was the main reason for buying it, the reserve should reflect that, and participation is a secondary benefit. If the battery was bought primarily for arbitrage or for a programme payment, a lower reserve is consistent with that purpose.

Cycles and Warranty

Dispatch events mean additional cycles beyond what household use would produce.

Battery warranties are typically expressed in terms of throughput or cycles as well as years, so additional cycling consumes warranty life. Some programmes address this explicitly, with the operator or the manufacturer accepting the additional cycling as part of the arrangement.

Establish how programme cycling interacts with the warranty before enrolling. It is a question with a written answer.

Reading an Offer

Four things determine whether a programme is worth joining.

How events are called. How often, how long, at what notice, and whether there is a cap on events per year.

What reserve is permitted, and whether you can change it.

How compensation works, whether upfront, ongoing, per event, or through a tariff.

What exit costs. Where an upfront subsidy toward equipment was provided, leaving early may require repaying part of it.

Programme terms are set by the operator and the utility. What is on offer varies by utility and by state, so compare the actual agreement rather than a general description of how these work.

Why They Exist

Grids face their hardest moments in narrow windows: a few hours on the hottest days, and during cold snaps in heating-dominated systems.

Meeting those peaks with generating plant means capacity that sits idle most of the year. Meeting them with distributed batteries that already exist for other reasons uses assets already installed and paid for.

That is the argument, and it is a reasonable one. It also means the resource is called upon precisely at the moments of greatest stress, which is the same sentence from the homeowner’s perspective with a different emphasis.

What People Get Wrong About This

The first mistake is enrolling a battery bought for backup without setting a reserve. The two purposes conflict at exactly the wrong moment.

The second is comparing programmes on headline payment alone, without reading how often events are called and how long they run.

A third is overlooking cycling against the warranty.

A fourth is assuming exit is free. Where equipment was subsidised, it may not be.

And the last is assuming a programme available elsewhere is available to you. These are local arrangements that differ by utility and by state.

Solar and blackouts covers what a battery does during an outage, which is the capability participation trades against. Battery bank sizing covers sizing, and a battery intended both for backup and for a programme needs sizing for both.

Common questions

What is a virtual power plant?

A group of distributed resources, usually home batteries with solar, coordinated by an operator and dispatched together so that the aggregate behaves like a single generating plant. Individually each is too small to participate in electricity markets; together they can.

What does the homeowner give up?

Control of the battery during dispatch events. The operator decides when it discharges, and those events occur precisely when the grid is stressed, which is often when you would most want the stored energy yourself. Programmes usually allow a reserve to be held back, and the size of that reserve is the setting that matters most.

Does it reduce backup capability?

It can. A battery discharged into the grid during an afternoon event has less available if an outage follows that evening. Setting a reserve that is never dispatched protects against this, at the cost of participating with less capacity.

How is participation compensated?

Arrangements vary: an upfront payment toward the battery, ongoing payments, per-event payments, or a preferential tariff. Terms are set by the operator and the utility and vary by programme, by utility and by state, so compare the specific offer rather than a general description.

Can I leave a programme?

Usually, subject to the agreement. Where an upfront subsidy toward equipment was provided, exit terms may require repayment of part of it, sometimes on a schedule. Read the exit provisions before enrolling rather than after.